Homes around Canadensis mostly run on copper wiring, the norm across Monroe County, paired with a 100 to 150-amp panel. That was plenty of capacity when the panel went in, but a heat pump, hot tub or EV charger can max it out fast. We check the panel before recommending anything.
PPL Electric Utilities is the utility here, and we schedule any service or meter upgrade directly with them. A Level 2 EV charger gets its own dedicated circuit, and a standby generator with an automatic transfer switch covers the outages that follow a Pocono storm.
Winter storms and downed trees are a regular cause of extended outages in this part of the mountains, and it shapes a lot of what we do out here.