Dimming lights, a warm breaker, a tripped circuit every time the microwave and the toaster run together. In a 1955 house those are symptoms of one thing: too much load on too little service. Plenty of Ridley Park homes still run on 60 amps, some through a fuse box, and the kitchen, the laundry and the air conditioning all compete for it.
We start by measuring. A load calculation shows what the house draws and what the service can give. Sometimes a few dedicated circuits solve it. More often the panel needs to grow to 200 amps, and we coordinate the meter change with PECO.
Every electrician we send is a Thomas Edison Electric employee who dispatches from home, somewhere around Delaware County, in a fully stocked TEE van. No subcontractors. The price goes on paper first, and if we run behind, the dispatch fee comes off.