In Hereford, as in the rest of Pennsylvania, electrical permits follow the state's Uniform Construction Code. The township contracts that review out to a third-party inspection agency instead of keeping it in-house, which is standard for townships this size. We file the paperwork, set the inspection date, and are on site when the inspector arrives.
Met-Ed is the utility for Hereford. Adding a hot tub circuit, a heat pump or an EV charger station often means upgrading the panel, and that needs a scheduled disconnect and reconnect at the meter, which we book as part of the project. Line issues outside the meter are Met-Ed's to fix. Everything from the meter inward, including the panel itself, is ours.